Cable Crews
Post work
← All work
Drop bury· sample listing

Drop bury crews, sand and sod, mini-ex and vac

Gulfstream Cable Partners · Tampa Bay and the Nature Coast (FL, GA) · posted 2d ago

$2.10 / ft
$125 per diem
$125 × 5 = $625 / wk
Net 30
Paid on days worked
Prime contractor
Gulfstream Cable Partners
Start date
Starts Sep 28 · 7 days
Work status
Crews on site now
Duration
24 weeks · 5 days a week
Headcount
10 crew positions
Hiring
Full crews
States
FL, GA

What this job requires of you, as posted

Paid as
1099
Truck and gear
You bring your own truck and gear
Travel
Either
Per diem
Paid on days worked

Before you dig

  • FLSunshine 811 needs 2 business days notice, tolerance 24" each side.Ticket good 30 calendar days from when the centre receives your notice.Two full business days, clock starting the day after. Ten for underwater work. No maximum.24 inches from the outer edge of the facility's exterior surface.Fla. Stat. ch. 556, §§556.102, 556.105
  • GAGeorgia 811 needs 2 business days notice, tolerance 18" each side.Two to eight business days. The clock starts at 7:00 a.m. on the first business day after Georgia 811 receives it.The facility's width plus 18 inches each side of its outside edge.Ticket life is 30 calendar days from an 'effective date' the statute does not pin down, so no date is shown.O.C.G.A. Title 25 ch. 9, §§25-9-3, 25-9-6

Check the ticket yourself before the first bore. This is a starting point, not legal advice, and the clock does not always start when you call.

Scope

Residential drop bury behind install, mostly sand and sod. Crews furnish mini-ex, vac trailer and locator. Restoration included in the footage rate. Locates called by the prime.

Contact

Ellis Vance · (555) 662-1174

Invented example. Nobody is on the other end of this one.