Underground / HDD· sample listing
Rock drill crews, dual-rod required, limestone
Cross Timbers Boring · I-35 corridor, Gainesville to Ardmore (TX, OK) · posted 17h ago
$7.20 / ft
$200 per diem
$200 × 7 = $1,400 / wk
Paid weekly
Paid seven days a week
- Prime contractor
- Summit Bore Partners
- Start date
- Starts Oct 3 · 12 days
- Work status
- Released — NTP in hand
- Duration
- 40 weeks · 6 days a week
- Headcount
- 11 crew positions
- Hiring
- Full crews
- States
- TX, OK
What this job requires of you, as posted
- Paid as
- 1099
- Truck and gear
- You bring your own truck and gear
- Travel
- Road crews welcome
- Per diem
- Paid seven days a week
Before you dig
- OK — OKIE811 needs 48 hours notice, tolerance 24" each side.Ticket good 14 calendar days from the start date you put on the ticket.48 hours excluding the date of notification, weekends and holidays. Clock starts the day after. No maximum in the current text.24 inches each side.63 O.S. 142.1 et seq., §§142.6, 142.7
- TX — Texas811 / Lone Star 811 needs 48 hours notice.No later than the 48th hour before you start, excluding weekends and legal holidays, and no earlier than the 14th day before. Notify on a Saturday and you may start the following Tuesday at 11:59 a.m. — Wednesday if the Monday is a holiday.No tolerance width is shown. The 18 inches people quote for Texas comes from a Railroad Commission rule that covers pipelines only and does not reach fibre, copper, electric, water or sewer. An excavator who has fully complied is not liable for damage to a facility that was not marked as the chapter requires.Tex. Util. Code ch. 251, subch. D
Check the ticket yourself before the first bore. This is a starting point, not legal advice, and the clock does not always start when you call.
Scope
Solid limestone, dual-rod machines only, no exceptions. Long-term footage with a signed two-year master build behind it. Mud and water supplied on site.
Contact
Lonnie Trask · (555) 553-0048
Invented example. Nobody is on the other end of this one.