Underground / HDD· sample listing
HDD crews, caliche and rock, desert mainline
Saguaro Underground · Phoenix east valley out to Las Cruces (AZ, NM) · posted 2d ago
$6.40 / ft
$175 per diem
$175 × 5 = $875 / wk
Net 15
Paid on days worked
- Prime contractor
- Desert Ridge Communications
- Start date
- Targeted start Oct 15
- Work status
- Awarded, waiting on NTP
- Duration
- 30 weeks · 5 days a week
- Headcount
- 8 crew positions
- Hiring
- Full crews
- States
- AZ, NM
What this job requires of you, as posted
- Paid as
- 1099
- Truck and gear
- You bring your own truck and gear
- Travel
- Road crews welcome
- Per diem
- Paid on days worked
Before you dig
- AZ — Arizona 811 — still Blue Stake to everyone who digs.No fixed number of days to count here — read the note before you schedule.Ticket good 15 working days from when marking is finished.Arizona does not run on a waiting period. You may not break ground until marking is complete or you are told marking is unnecessary — however long that takes. The operator has two working days to get it done; that is their deadline, not your countdown.The two working days crews quote for Arizona is the operator's marking deadline under subsection B, not a period you can wait out and then dig. Note also that ticket life runs from the date of MARKING, not from the date you called — so a slow locate does not eat your fifteen days, it postpones the start of them. Large projects have their own rule: notify as soon as possible but not less than fifteen business days or twenty-one calendar days before the proposed start. No tolerance width is shown; the statute sets none. Subsection E does require you to keep 'sufficient clearance' between a bore path and a marked facility without ever saying how much.A.R.S. §40-360.22
- NM — New Mexico 811 needs 2 working days notice, tolerance 18" each side.Ticket good 10 working days from the day you call.Two working days — the statute defines 'advance notice' as exactly that and then uses the phrase throughout, so there is no separate number to look up.Eighteen inches between the facility itself and the cutting edge or point of any mechanical equipment, until the line is first exposed. Measured from the line, not from the paint.New Mexico never says a ticket expires. It says you must request reaffirmation of line location every ten working days after the initial request, which comes to the same thing on site. The definitions section backs the figure up from the other end: a legal mark is one 'designed to last at least ten working days if not disturbed'. Positive response is available and the statute expects you to use it before you commute to the site.NMSA 1978 §§62-14-2, 62-14-3
Check the ticket yourself before the first bore. This is a starting point, not legal advice, and the clock does not always start when you call.
Scope
Mainline conduit along state routes and county roads. Caliche throughout, decomposed granite and rock on the New Mexico end — dual-rod machines only. Prime pulls permits. Summer start times are 4am with a heat cutoff by 1pm. Restoration by others.
Contact
Ruben Castellano · (555) 480-3312
Invented example. Nobody is on the other end of this one.