FTTH install· sample listing
FTTH install, tribal lands build, travel paid
High Plains Connect · Missouri River corridor (SD, MT) · posted 8d ago
$115 / drop
$200 per diem
$200 × 7 = $1,400 / wk
Net 15
Paid seven days a week
- Prime contractor
- Dakota Access Fiber
- Start date
- Starts Oct 14
- Work status
- Released — NTP in hand
- Duration
- 20 weeks · 6 days a week
- Headcount
- 7 techs
- Hiring
- Individual techs
- States
- SD, MT
What this job requires of you, as posted
- Paid as
- 1099
- Truck and gear
- You bring your own truck and gear
- Travel
- Road crews welcome
- Per diem
- Paid seven days a week
Scope
Greenfield build with very long drops and limited cell coverage on site. Aerial and buried mix. Per diem paid seven days for the duration, hotel not included. Plan on four a day, not nine, and bring spares.
Contact
Jeanette Poe · (555) 605-4417
Invented example. Nobody is on the other end of this one.