Cable Crews
Post work
← All work
FTTH install· sample listing

FTTH install and activation, long rural drops

Blue Ridge Access · Shenandoah Valley (VA, MD) · posted 2d ago

$105 / drop
$180 per diem
$180 × 5 = $900 / wk
Net 15
Paid on days worked
Prime contractor
Appalachian Access Fiber
Start date
Starts Sep 29 · 8 days
Work status
Crews on site now
Duration
18 weeks · 5 days a week
Headcount
9 techs
Hiring
Individual techs
States
VA, MD

What this job requires of you, as posted

Paid as
1099
Truck and gear
You bring your own truck and gear
Travel
Road crews welcome
Per diem
Paid on days worked

Scope

Greenfield build with drops running 200 to 450 feet, aerial and buried mix. Long driveways and real terrain, so plan on four to six a day rather than nine. Two years of install experience expected.

Contact

Priya Raman · (555) 540-7768

Invented example. Nobody is on the other end of this one.