FTTH install· sample listing
FTTH install and activation, long rural drops
Blue Ridge Access · Shenandoah Valley (VA, MD) · posted 2d ago
$105 / drop
$180 per diem
$180 × 5 = $900 / wk
Net 15
Paid on days worked
- Prime contractor
- Appalachian Access Fiber
- Start date
- Starts Sep 29 · 8 days
- Work status
- Crews on site now
- Duration
- 18 weeks · 5 days a week
- Headcount
- 9 techs
- Hiring
- Individual techs
- States
- VA, MD
What this job requires of you, as posted
- Paid as
- 1099
- Truck and gear
- You bring your own truck and gear
- Travel
- Road crews welcome
- Per diem
- Paid on days worked
Scope
Greenfield build with drops running 200 to 450 feet, aerial and buried mix. Long driveways and real terrain, so plan on four to six a day rather than nine. Two years of install experience expected.
Contact
Priya Raman · (555) 540-7768
Invented example. Nobody is on the other end of this one.