Underground / HDD· sample listing
Underground crews, urban street cut and restore
Steel City Underground · Chicago south and west suburbs (IL) · posted 11d ago
$7.80 / ft
$150 per diem
$150 × 5 = $750 / wk
Net 30
Paid on days worked
- Prime contractor
- Keystone Ridge Communications
- Start date
- Targeted start Oct 13
- Work status
- Staffing ahead of award
- Duration
- 18 weeks · 5 days a week
- Headcount
- 8 crew positions
- Hiring
- Full crews
- States
- IL
What this job requires of you, as posted
- Paid as
- 1099
- Truck and gear
- You bring your own truck and gear
- Travel
- Either
- Per diem
- Paid on days worked
Before you dig
- IL — JULIE (Chicago has its own — call DIGGER) needs 2 working days notice.Two to ten days — and the Act defines a day as excluding weekends, JULIE holidays, and the day you actually gave notice. Two days means two working days after today.The figure people quote for Illinois is often 48 hours with a 14-day maximum. That is the pre-2025 text, and in the permissive direction — it would have you digging early. It is also easy to read 'not less than 2 days' as two calendar days, which is wrong by a whole weekend: the definitions section at 220 ILCS 50/2 excludes Saturdays, Sundays, JULIE holidays and the day of notice. Chicago runs its own centre.220 ILCS 50/4(d), with 'day' defined at 220 ILCS 50/2
Check the ticket yourself before the first bore. This is a starting point, not legal advice, and the clock does not always start when you call.
Scope
Street cut and restore through dense suburban grid with heavy existing utility congestion. Potholing is required, not optional, and we will check. Municipal restoration specs apply and inspections are strict.
Contact
Frank Delgado · (555) 312-8890
Invented example. Nobody is on the other end of this one.