Drop bury· sample listing
Drop bury, per-foot with restoration, steady through spring
Lakebed Utilities Group · Toledo and the lake shore (OH) · posted 10d ago
$2.10 / ft
$125 per diem
$125 × 5 = $625 / wk
Net 30
Paid on days worked
- Prime contractor
- Northfield Broadband Partners
- Start date
- Targeted start Oct 10
- Work status
- Awarded, waiting on NTP
- Duration
- 20 weeks · 5 days a week
- Headcount
- 7 crew positions
- Hiring
- Full crews
- States
- OH
What this job requires of you, as posted
- Paid as
- 1099
- Truck and gear
- You bring your own truck and gear
- Travel
- Either
- Per diem
- Paid on days worked
Before you dig
- OH — OHIO811 — crews still say OUPS needs 2 working days notice, tolerance 18" each side.You must break ground within 16 calendar days from when the centre receives your notice.Not counting the day you call, and no more than 16 calendar days ahead. A ticket filed at 9pm Monday still burns Monday, so you dig Thursday.18 inches each side of the facility itself, not of the paint line. Hand tools, hydro or air vacuum inside it.Ohio rewrote its dig law in June 2026, so most summaries are out of date. HB 227 also added ORC 3781.261: anyone with responsibility in the 811 process needs documented damage-prevention training, provided at initial assignment and renewed every five years. If you are mobilizing a crew into Ohio, that paperwork has to exist before the first ticket. OHIO811 runs the training free.ORC 3781.28 (notice) and 3781.25 (tolerance) — rewritten by HB 227, effective 9 June 2026
Check the ticket yourself before the first bore. This is a starting point, not legal advice, and the clock does not always start when you call.
Scope
Residential drop bury behind install, sandy soil near the shore and clay once you move inland. Restoration and seed in the rate. Frost is the real schedule risk here — we build a two-week float into the duration and expect you to as well.
Contact
Sam Ostrowski · (555) 129-6643
Invented example. Nobody is on the other end of this one.