Missouri: 2 working days before you dig.
Missouri 811 · RSMo ch. 319, §§319.015, 319.025, 319.026 (as amended by SB 133)
Read off the statute on . If it has moved since, tell us and we will re-read it.
A waiting period is not always permission. Some states also require that every operator has answered before you break ground, and some require you to mark your own dig path first. Where we have read that requirement, it is in the notes on this page. Where this page is silent, we have not checked it yet — silence here is not the same as absence. We are working through the rest and dating each one as it lands.
Notice before you break ground
2 working days
Two to ten working days.
Tolerance zone
24" each side
The facility's width plus two feet each side.
Ticket good for
21 calendar days from the day you actually start work
You must break ground within
10 working days from when the centre receives your notice
Worth knowing in Missouri
Two clocks again: 21 days of ticket, but only 10 working days to break ground.
Common questions about digging in Missouri
- How much notice do you have to give before digging in Missouri?
- 2 working days before you break ground, through Missouri 811. Two to ten working days.
- How long is an 811 ticket good for in Missouri?
- 21 calendar days from the day you actually start work.
- What is the tolerance zone in Missouri?
- 24" each side. The facility's width plus two feet each side.
- How soon do you have to start work after calling 811 in Missouri?
- 10 working days from when the centre receives your notice.
Check it yourself
Every figure here was read off RSMo ch. 319, §§319.015, 319.025, 319.026 (as amended by SB 133), not off a summary — summaries of these get the unit wrong, and the unit is usually a weekend. Read the source.